top of page
Gallina Kitchen
Date Completed: August 2018
Square Feet:
Time to build: 4 Weeks
Location: Grass Valley, California
Details: New Island cabinets, removed desk top cabinet, wing wall left side of desk cab removed, electrical relocated. Painted all existing cabinets. All new "Azul Fantasy" Granite counter tops. New sink, dishwasher, faucet, etc. Painted Kitchen & Family Room walls, new hanging lights over Island cabs.
Special Notes:


Before & After
From concept to creation.
The kitchen was outdated and needed redesign. After just a few weeks time, a phenomenal transformation took place.



Before Renovation
After Renovation
Building the future. Restoring the past.

bottom of page