Taylor's Deck Refinish
Date Completed: April 2018
Square Feet: 755 sq. ft.
Time to build: 14 Days
Location: Lake Tahoe, CA
Special Notes: The redwood that was preserved was old, dry-rotted and brittle in most areas, however the homeowner enjoyed the rustic look of the wood. Much care was taken to preserve 95% of the original redwood to maintain the desired look.

Freestanding Deck Pathway
The entire (sq ft) deck was covered in three layers of acrylic paint. After sanding every board individually and reapplying to deck, we used an industrial sander to run over the top of each plank. After two coats of this nice stain, the deck came out stunning.


Get a quote today!
530.906.2389

BEFORE
BEFORE
AFTER

Exterior Stairwell
Make old look new!

BEFORE
Stream Bridge
Before
This is what Joyce Taylor's Bridge looked like before we got to it.



Stream Bridge After
Integrity Builders can build custom wood-working projects, like this one here. Within the photo, Integrity Builders is solely responsible for the refinishing work.